A framework-agnostic risk register — likelihood x impact scoring with a computed, never freeform, residual; operator overrides recorded as a chained exception; crosswalk pointers into any shipped framework pack; and a risk-treatment-plan evidence artifact.

@caisson-sh/risk-register is Caisson's framework-agnostic risk register: every entry is rated on a likelihood/impact scale, and the residual risk score is always the computed product of that rating — there is no field for writing a residual by hand, so a register can never carry a number nobody can explain.

What it does

  • A computed, type-branded residual. computeResidual(likelihood, impact) is the only function that can produce a Residual (1–25); its return type carries a phantom brand a plain number literal cannot satisfy, so defineRiskEntry rejects a caller-supplied residual before any validator even runs.
  • Chained operator overrides, never a silent edit. recordResidualOverride appends a risk.residual-overridden record — who asserted it, why, when, and the computed value it supersedes — to the tenant's @caisson-sh/audit-worm chain; RiskEntry.residual itself never changes.
  • Crosswalk reuse, not reinvention. Every entry's crosswalk field is @caisson-sh/frameworks-pack's own CrosswalkReference shape, so a risk can point at any shipped framework pack's canonical controls the same way a control points at an external framework.
  • A risk-treatment-plan evidence artifact. buildRiskTreatmentPlan folds a register snapshot and its resolved overrides into one canonical, byte-stable RiskTreatmentPlan: every row's effectiveResidual is derived (the override's when one governs, else the computed value), and the summary counts (totalRisks, overriddenCount, unmitigatedCount) are re-checked against the rows, never asserted independently.

Install

bun add @caisson-sh/risk-register

Quickstart

import { defineRiskEntry } from "@caisson-sh/risk-register";

const entry = defineRiskEntry({
  riskId: "R-14",
  subject: "default model lane",
  likelihood: "possible",
  impact: "major",
  treatmentPlan:
    "Rate-limited with a human-review fallback on repeated failures.",
  owner: "safety@example.com",
  evidenceDigest, // SHA-256 hex digest of the evidence the scoring rests on
  crosswalk: [],
});

entry.residual; // computed from likelihood x impact — never supplied by the caller

likelihood is one of rare / unlikely / possible / likely / almost-certain; impact is one of negligible / minor / moderate / major / severe. The residual is their ordinal product (1–25).

Recording an override

import { recordResidualOverride } from "@caisson-sh/risk-register";

const { record } = await recordResidualOverride({
  chain, // an AuditChainStore (or a Pick<AuditChainStore, "append">)
  accountId,
  riskId: entry.riskId,
  computed: entry.residual,
  overrideLikelihood: "almost-certain",
  overrideImpact: "major",
  who: "ciso@example.com",
  why: "Escalating: this model lane also handles regulated PII, treat as higher likelihood.",
  now: new Date(),
});

record.computed; // the value being overridden, carried forward untouched
record.override; // computeResidual(overrideLikelihood, overrideImpact)

The chain append is the exception record, not a description of one filed elsewhere: if it throws, the whole call throws — an override the chain cannot prove is no override at all.

Building a risk-treatment-plan artifact

import { buildRiskTreatmentPlan } from "@caisson-sh/risk-register";

const { plan, canonicalPlan } = buildRiskTreatmentPlan({
  tenantId,
  risks: [entry],
  overridesByRiskId: new Map([[entry.riskId, record]]),
});

plan.summary.posture;
// "1 risk on register; 1 of 1 carry a recorded treatment plan; 1 residual carry an operator override."

Rows are sorted by riskId so input order never changes the output bytes; effectiveResidual is re-derived from each entry's own likelihood/impact, never trusted off a carried field, so a tampered entry can't smuggle a forged residual into a compliance artifact.

Composes with

@caisson-sh/risk-register depends on @caisson-sh/audit-worm for the override's chain anchor and @caisson-sh/frameworks-pack for the crosswalk shape, down-only. It is a member of the Compliance family.